|
COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 5,1997 PSA#192431st CONS/LGCC, Unit 6102 Box 140, APO AE 09601-2140 C -- ENVIRONMENTAL ASSESSMENT AND REMEDIAL ACTION FEASIBILITY STUDY
AND RISK ASSESSMENT, AVIANO AIR BASE, ITALY SOL F61211-97-R0019 DUE
092397 POC Luciano Netto, Contracting Officer, 011-39-434667176 E-MAIL:
nettol@smtpgate.aviano.af.mil, nettol@smtpgate.aviano.af.mil.
Environmental assessment/remedial actions feasibility study and risk
assessment at two locations on Aviano air Base, Italy. Firm Fixed price
contract is contemplated to accurately assess possible migrating
hydrocarbon pollution phenomenon due to past activity. Performance in
three phases. Phase I- preliminary site survey, review of previous
investigatory and other pertinent data, synthesis and presentation of
comprhensive phase II and phase III workplan. Phase II- execution of
sites exploration, testing, sampling and analysis. Phase III-
preparation and presentation of a pollution and environmental and risk
assessment and remedial actions study report. Work includes interface
and coordination with host country regulatory authorities and
translation into the host country language of all work products.
Interested firms must submit Standard Forms 254 and 255 for
consideration by the Pre selection and Selection Boards. Selection
boards will examine submitted forms and score submissions to determine
final selection slate based on following criteria and maximum
available points: Specialized experience in conducting site
assessments, hydrogeological investigations/feasibility studies and
remedial design/actions for soils and groundwater contaminated by
hydrocarbons -- Maximum 25 points; Past performance, consists in a
documented track record (case studies) of the firm's successful use of
a variety of subsurface investigatory and remediation technologies
some of which are complex and new -- Maximum points 22. Professional
Qualifications consisting of the credentials and experience levels of
the staff intended to be assigned to this project especially as they
relate to the type of work considered for the proposed contract --
Maximum points 20. Professional capacity to harness resources to
accomplish the work within the required 240 day time frame -- Maximum
15 points. Location, firms must be operating on the European continent
and preferrably in Italy -- Maximum points 15. Volume of DoD work
greater the volume of DoD work performed less points will be obtained
-- Maximum points 2. Required forms may be submitted even by fax to
either of the following numbers 011-39-434-667979/668758. (0246) Loren Data Corp. http://www.ld.com (SYN# 0025 19970905\C-0005.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|