Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 23,1997 PSA#1998

Alliant Techsystems Incorporated, Allegany Ballistics Laboratory, P.O. Box 210, State Route 956, Rocket Center, WV 26726

Z -- REPLACE EXISTING BOILER FEEDWATER EQUIPMENT SOL PHC-223 DUE 030198 POC Patrick H. Cunningham, 304-726-5047 E-MAIL: Patrick H. Cunningham, PAT_CUNNINGHAM@ATK.COM. The work consists of the replacement of existing boiler feedwater equipment and blowdown treatment with a new system. The work will include excavation, steel structural work, tank, piping, electrical and related instrumentation. Estimate total cost is between $1,500,000 and $2,500,000. Term of the effort will be 180 days. Plans and Specifications will be available on or about 1/30/98. Bonds will be required. West Virginia Contractors License must be submitted prior to commencement of work by Contractor and all Subcontractors. $35 non-refundable fee payable to Alliant Techsystems must be submitted with WRITTEN request to obtain plans and specifications. Alliant reserves the right to refuse written requests for plans and specifications on or after January 20, 1998 (0353)

Loren Data Corp. http://www.ld.com (SYN# 0137 19971223\Z-0023.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page