|
COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 23,1997 PSA#1998Alliant Techsystems Incorporated, Allegany Ballistics Laboratory, P.O.
Box 210, State Route 956, Rocket Center, WV 26726 Z -- REPLACE EXISTING BOILER FEEDWATER EQUIPMENT SOL PHC-223 DUE
030198 POC Patrick H. Cunningham, 304-726-5047 E-MAIL: Patrick H.
Cunningham, PAT_CUNNINGHAM@ATK.COM. The work consists of the
replacement of existing boiler feedwater equipment and blowdown
treatment with a new system. The work will include excavation, steel
structural work, tank, piping, electrical and related instrumentation.
Estimate total cost is between $1,500,000 and $2,500,000. Term of the
effort will be 180 days. Plans and Specifications will be available on
or about 1/30/98. Bonds will be required. West Virginia Contractors
License must be submitted prior to commencement of work by Contractor
and all Subcontractors. $35 non-refundable fee payable to Alliant
Techsystems must be submitted with WRITTEN request to obtain plans and
specifications. Alliant reserves the right to refuse written requests
for plans and specifications on or after January 20, 1998 (0353) Loren Data Corp. http://www.ld.com (SYN# 0137 19971223\Z-0023.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|