|
COMMERCE BUSINESS DAILY ISSUE OF MAY 1,1998 PSA#2086Sa-Alc/Propulsion Directorate, 485 Quentin Roosevelt Road, Kelly AFB,
Texas 78241-6427 28 -- 2ND STAGE LPT SEAL SOL F41608-98-Q-49126 DUE 060198 POC For
copy, Fax request to LPKBD at 210-925-2398, For additional information
contact Ramirez, M./lpkbd/[210]925-8731 Item 0001 NSN
2840-01-198-9105PS P/N: 9395M62G01, SEALS ARE INTERSTAGE SEALS ATTACHED
TO INNER ENDS OF NOZZLE VANES AND MAINTAIN LOW INTERSTAGE HUB LEAKAGE.
(THIS FIRST ARTICLE WILL NOT BECOME PART OF PRODUCTION QUANTITY)
(DESTRUCTION IN TESTING IS ANTICIPATED)_(TESTING AT CONTRACTOR'S PLANT)
(THIS FIRST ARTICLE WILL BE KEPT AT CONTRACTOR'S PLANT) 67EA.
Applicable to: Tf39 Engine, C-5a/B. Destn: Kelly AFB, Texas 78241-6427.
Delivery: 31 DEC 98 67 ea Item 0002 NSN 2840-01-198-9105PS 2nd Stage
Lpt Seal P/N: 9395M62G01, SEALS ARE INTERSTAGE SEALS ATTACHED TO INNER
ENDS OF NOZZLE VANES AND MAINTAIN LOW INTERSTAGE HUB LEAKAGE. (THIS
FIRST ARTICLE WILL NOT BECOME PART OF PRODUCTION QUANTITY) (DESTRUCTION
IN TESTING IS ANTICIPATED)_(TESTING AT CONTRACTOR'S PLANT) (THIS FIRST
ARTICLE WILL BE KEPT AT CONTRACTOR'S PLANT) 2ea. Applicable to: Tf39
Engine, C-5a/B. Destn: Kelly AFB, Texas 78241-6427. Delivery: 31 DEC 98
2 ea Item 0003 NSN 2840-01-198-9105PS 2nd Stage Lpt Seal P/N:
9395M62G01, SEALS ARE INTERSTAGE SEALS ATTACHED TO INNER ENDS OF NOZZLE
VANES AND MAINTAIN LOW INTERSTAGE HUB LEAKAGE. (THIS FIRST ARTICLE WILL
NOT BECOME PART OF PRODUCTION QUANTITY) (DESTRUCTION IN TESTING IS
ANTICIPATED)_(TESTING AT CONTRACTOR'S PLANT) (THIS FIRST ARTICLE WILL
BE KEPT AT CONTRACTOR'S PLANT) 1ea. Applicable to: Tf39 Engine, C-5a/B.
Destn: LEFT AT CONTRACTOR'S PLANT. Item 0004 data, 1 lot Qualification
requirements: Sources must be qualified prior to being considered for
award. The solicitation will contain instructions for obtaining
further information on this requirement. The requirements of FAR
9.202(A) have been completed and copies of the qualification
requirements and standards may be obtained as described in the
solicitation. These qualification requirements apply to line item(s)
002,003,004 ITEM REQUIRES SOURCE APPROVAL BY DESIGN CONTROL ACTIVITY
FAILURE OF THIS PART WOULD RESULT IN EXTENSIVE DAMAGE TO ENGINE The
approximate issue/response date will be 01 May 98. The anticipated
award date willbe 07 AUG 98. Written procedure will be used for this
solicitation. To: General Electric Co, Cincinnati Oh 45215-6303. To:
Tube Processing Corp, Indianapolis In 46203-0049. First article test
required. No telephone requests. Only written or faxed requests
received directly from the requestor are acceptable. All responsible
sources solicited may submit a bid, proposal, or quotation which shall
be considered. See Note (s) 23,26. (0119) Loren Data Corp. http://www.ld.com (SYN# 0206 19980501\28-0011.SOL)
28 - Engines, Turbines and Components Index Page
|
|