|
COMMERCE BUSINESS DAILY ISSUE OF AUGUST 7,1998 PSA#2154Federal Correctional Institution, Morgantown, PO Box 1000, Morgantown,
WV 26507-1000 Y -- REPLACEMENT STEPS AND SIDEWALKS SOL IFB103-082 DUE 091698 POC
John Cunningham, Contract Officer (304)296-4416 ext 290 The Federal
Correctional Institution at Morgantown, WV, requires removal of
existing concrete steps and slab at Chapel and rear exit of
Administration Building and replace with reinforced concrete steps and
slabs per drawings. The renovation consists of an area approximately
7,375 square feet and approximately 108 cubic yards of concrete. This
construction also includes a handicapped ramp for accessibility to the
Chapel. Estimated cost range of this construction is between $25,000
and $100,000. This acquisition is 100% set aside for small business.
Solicitation requests must be in writing only. Posted 08/05/98
(I-SN232951). (0217) Loren Data Corp. http://www.ld.com (SYN# 0162 19980807\Y-0032.SOL)
Y - Construction of Structures and Facilities Index Page
|
|