|
COMMERCE BUSINESS DAILY ISSUE OF AUGUST 24,1998 PSA#2165U. S. ARMY CORPS OF ENGINEERS, 2000 FT. POINT RD, CONTRACTING DIVISION,
P. O. BOX 1229, GALVESTON TX 77553-1229 Y -- CONTROL STRUCTURE "A", WALLISVILLE RESERVOIR, TRINITY RIVER AND
TRIBUTARIES, TEXAS IN LIBERTY COUNTY SOL DACW64-98-B-0028 DUE 102398
POC Contract Specialist Lucy Smith (409) 766-3845 Contracting Officer
Carol A. Devany (409) 766-3852 (Site Code DACW64) The work consists of
excavation, backfill, dewatering, concrete placement, riprap,
fabrication and installation of steel control gate, pile driving, and
turf establishment. The plans and specifications for this project will
be placed on CD-ROM (No Charge). Subcontracting goals for the
Galveston District are: 61.2%-Small Business; 9.1%-Small Disadvantaged
Business; and 4.5%-Woman Owned Business. Price range for this work is
between $1,00,000.00 and $5,000,000.00. Posted 08/20/98 (I-SN239971).
(0232) Loren Data Corp. http://www.ld.com (SYN# 0164 19980824\Y-0013.SOL)
Y - Construction of Structures and Facilities Index Page
|
|