COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 21,1998 PSA#2246Commander, U.S. Army Aviation and Missile Command, Acquisition Center,
Research Development and Engineering Center, Redstone Arsenal, AL
35898-5000 A -- APPLIED TECHNOLOGY INITIATIVES TECHNICAL AND ENGINEERING SUPPORT
SOL DAAH01-98-R-R020 POC Monica Williams, Contract Specialist,
256-876-8341, Judy Lundy, Contracting Officer, 256-876-1470 This
synopsis announces a DRAFT Request for Proposal for technical and
engineering support to the U.S. Army Aviation and Missile Command,
Applied Technology Initiatives (ATI) Directorate for Statement of Work
(SOW) entitled "Applied Technology Initiative Technical and
Engineering Support." The SOW provides technical and engineering
support in performance of the Directorate's Mission to design,
integrate and test advanced technology weapon systems and systems of
systems dedicated to increasing the power projection capabilities of
Army forces by decreased target-acquisition and engagement timelines,
increased lethality of systems, increased survivability of systems and
solders and increased control of tempo of battle. The contractor shall
be required to perform a major portion of this effort on-site (Redstone
Arsenal, AL). The SIC Code for this acquisition is 8731. This
acquisition will be solicited utilizing full and open competitive
procedures. The Government intends to award up to 2 contracts as a
result of this solicitation. The first contract award is to be made to
the best value proposal without regard to status and the second
contract award is to be made to the best value proposed submitted by a
small business. The Government reserves the right to make less than 2
awards. Cost-Plus-Fixed-Fee-Level-Of-Effort contracts are anticipated
as a result of this solicitation. The contracts will be made for a
term of the base year and four option years (total effort 60-months).
The basic level-of-effort will be determined at time of award. Option
I -- Year I, level-of-effort will consist of 393,500 manhours. Option
I -- Year II, level of effort will consist of 206,900 manhours. Option
III -- Year III, level-of-effort will consist of 206,900 manhours.
Option IV -- Year IV, level-of-effort will consist of 206,900 manhours.
Option V -- Year V, level-of-effort will consist of 312,550 manhours.
Therefore, the total consists of 1,326,750 manhours. *POC for inquiries
generated by this synopsis is Monica Williams at 256-876-8341. ***The
Formal Request for Proposal (RFP) for the above stated requirement will
not be released as indicated in the Executive Summary of the Draft RFP
due to the fact that certified funds are not currently available at
this time. A presolicitation synopsis will precede issuance of the
Formal RFP for the above stated requirement, should certified funds
become available. ***Annotates modification. Posted 12/17/98
(W-SN281539). (0351) Loren Data Corp. http://www.ld.com (SYN# 0006 19981221\A-0006.SOL)
A - Research and Development Index Page
|
|