COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 3,1999 PSA#2275CONTRACT DAAB07-84-C-J549, INSTALLATION OF ECP-024 The contractor shall
accomplish all efforts required to remove the Computer Processor (the
MAXAL unit), install the Advanced Programmable Controller (APC) and
modify AN/USC-28 rack wiring to provide system power to the APC. This
effort shall include all installation and test requirements contained
in Raytheon Drawing #5160398. The above effort was previously
accomplished under Raytheon Contract DAAB07-95-C-A501. Twenty-one
AN/USC-28 sites remain to have ECP-024 installed, which is contemplated
under the subject contract. The P.O.C. for this action is Mr. Donald L.
Baldwin at (732) 532-3926. E-MAIL: Click here to e-mail the POC,
baldwind@doim6.monmouth.army.mil. Posted 02/01/99 (D-SN293291). Loren Data Corp. http://www.ld.com (SYN# 0472 19990203\SP-0007.MSC)