COMMERCE BUSINESS DAILY ISSUE OF JUNE 10,1999 PSA#2364General Services Administration, Public Buildings Service (PBS),
Property Management Contracts Branch (5PMC), 230 South Dearborn Street,
Room 3324, Chicago, IL, 60604 C -- ARCHITECT-ENGINEER CONTRACT SOL GS05P99GAD0191 DUE 070899 POC
George Kanakaris, Contracting Officer, Phone (312) 886-4116, Fax (312)
353-0240, Email george.kanakaris@gsa.gov -- George Kanakaris,
Contracting Officer, Phone (312) 886-4116, Fax (312) 353-0240, Email
WEB: Visit this URL for the latest information about this,
http://www.eps.gov/cgi-bin/WebObjects/EPS?ACode=P&ProjID=GS05P99GAD019
1&LocID=130. E-MAIL: George Kanakaris, george.kanakaris@gsa.gov.
Indefinite quantity contract to provide full service Supplemental
Architect-Engineer Services based on, but not limited to, the issuance
of work orders for the preparation of designs, plans, specifications,
estimates, record drawings, miscellaneous studies and reports,
interior design and space planning, surveys, and construction
inspection services for projects within the geographic borders of Cook
County, State of Illinois. Also, projects may involve work in
specialty areas such as alterations in historic buildings or asbestos
abatement work. Services may include assisting the General Services
Administration (GSA) staff in "in-house" design and construction
inspections. Other construction related services which may be awarded
include land surveys, and material testing services (including
concrete, structural steel, soils testing, comprehensive subsurface
investigations and structural studies of existing buildings).
Disciplines and services required may include architectural,
electrical, mechanical, structural, civil engineering, communications,
energy conservation, cost estimating, elevator design, firesafety and
hazardous material consultant services. The total duration of the
contract is five (5) years. The base contract will be one-year period
with a provision for four one-year period options to extend the term of
the contract. The minimum amount payable under this contract is
Five-thousand ($5,000) dollars for each one-year period. The maximum
amount payable under this contract may not exceed
Seven-hundred-fifty-thousand ($750,000) dollars for each one-year
period. Consideration will be limited to firms having an existing
active design production office within the geographical borders of the
Cook County, State of Illinois. Each member of any proposed joint
venture must have an existing design production office within the
designated geographic limitations. Joint ventures or firm/consultant
arrangements will be considered and evaluated on a demonstrated
interdependency of the members to provide a quality design effort. In
addition, all firms and their consultants must: 1) Have in-house
computer aided design (CAD) capabilities (compatible with the latest
version of AutoCAD); 2) Prepare all specifications electronically
(compatible with the latest version of Microsoft Word) for projects
under this contract using the AIA Masterspec and; 3) Prepare all
estimates electronically (compatible with the latest version of
Microsoft Excel). Consideration for selection will be based upon the
following evaluation criteria categories: 1) Project Team (15%): Key
Personnel, Qualifications, and relevant experience as individuals and
as a team; 2) Design Management (30%): Project management plan,
facilities, capabilities, and techniques; 3) Design ability (30%):
Visual and narrative evidence of team_s ability with respect to
innovative design solutions; 4) Experience (25%): Performance on
similar projects. In determining pricing for Architect-Engineer Work
Orders, the Government may use the fixed price amounts provided in the
"Supplemental Architect-Engineer Contract Lookup Table." This table
will be provided to the Architect-Engineer Contractor during initial
contract negotiations. However, the Government reserves the right to
award a contract based on negotiated hourly rates only. Responses,
Standard Form 254 and Standard Form 255, must be received not later
than thirty (30) calendar days and by 4:00 PM (Local Time) from the
date of publication of this notice. If the 30th day falls on Saturday,
Sunday or US Government holiday, responses must be received by 4:00 PM
(Local Time) on the next government business day. Responses shall be
addressed to GSA, Property Management Contracts Branch 5PMC, 230 South
Dearborn Street., Suite 3324, Chicago, Illinois 60604, Attention:
Michael Wolff or George Kanakaris. A follow-up listing of firms to be
interviewed will appear in this publication after reviewing their
responses. This is not a request for proposal. The procurement is open
to all businesses. Currently, funds are not available. Forfurther
information contact Edward Layer, Section Supervisor, Illinois and
Indiana Project Team at (312) 353-1492. Posted 06/08/99 (D-SN340457).
(0159) Loren Data Corp. http://www.ld.com (SYN# 0021 19990610\C-0001.SOL)