COMMERCE BUSINESS DAILY ISSUE OF JULY 12,1999 PSA#2385USDA Forest Service, Mt. Hood National Forest, 16400 Champion Way,
Sandy, OR 97055 Y -- EAGLE CREEK SUSPENSION BRIDGE SOL R6-6-99-126 DUE 082399 POC Lois
K. Tate, Contracting Officer (503) 668-1768 WEB: GPO341093,
http://fs:fed.us/r6/mthood/noca. E-MAIL: Eagle Creek Suspension Bridge,
erinagoff@usa.gov. Website URL: http://fs:fed.us/r6/mthood/noca This
project consists of replacing the 133-foot single span wooden
suspension bridge in like kind. The bridge is supportd by two (2)
cables and 2, 28-foot towers. The deck or walking surface is 48 inches
wide. Existing cable anchorages will be used. The cable from the
previous bridge will be furnished by the Government. The Desired Start
Work Date is September 6, 1999. The project is located in the Columbia
River Gorge National Scenic Area, Multnomah County, Oregon. Estimated
construction range is between $100,000 and $200,000. Recommended
Contract Time is 270 Calendar Days. Posted 07/08/99 (W-SN351681).
(0189) Loren Data Corp. http://www.ld.com (SYN# 0129 19990712\Y-0002.SOL)