|
COMMERCE BUSINESS DAILY ISSUE OF AUGUST 24,1999 PSA#2417U.S. Army Corps Of Engineers -- Mobile, Contracting Division, CESAM-CT
(109 St. Joseph Street 36602) PO Box 2288, Mobile, AL 36628-0001 Y -- DESIGN AND CONSTRUCTION OF COMBINED COUNTERNARCOTICS CONTROL
FACILITY PUCALLPA, PERU SOL DACA01-99-R-0075 DUE 101399 POC Contact
Karen Johnson, (334) 690-2535; Contracting Officer, Sue Speights WEB:
http://www.sam.usace.army.mil/sam/ct/cgi-win/projlist.exe,
http://www.sam.usace.army.mil/sam/ct. E-MAIL:
cesam.plansroom@sam.usace.army.mil, cesam.plansroom@sam.usace.army.mil.
Design and construction of Combined Counternarcotics Control Facility,
Pucallpa, Peru. Facilities include construction of barracks facility,
kitchen/dining/laundry facility, connections to existing electrical,
water, and sanitary sewage systems and sitework. Bid documents are
available on or about 8 September 1999. Estimated cost of work is
between $500,000 and $1,000,000. Requests for plans and specifications
shall indicate in writing whether firm will bid as a prime contractor
or a subcontractor. Unrestricted. All responsible sources may submit
an offer, which shall be considered. Prospective bidders and
Plans/Dodge Rooms interested in receiving one free paper copy of this
solicitation must fax a request to 334-694-4343, Attn: Plans Room,
CESAM, or mail the request to Corps of Engineers, P O Box 2288, Room
6018, Mobile, AL 36628. Bidders must provide complete physical mailing
address for overnight delivery, telephone and fax numbers and point of
contact. Telephonic requests will not be accepted. A limited number of
plans and specifications will be printed and will be available on a
first come-first serve basis, until supplies are exhausted. Reprints
will not be made. Specifications and drawings will not be available
after the bid opening date. Prime contractors proposing under this
solicitation must be U.S. firms, Peruvians firms, or joint ventures
between U.S. firms and Peruvian firms. In country Contractors may
obtain plans and specifications at the Peru Project Office. All bid
forms, bid bonds, and other normal documents required for the bid
submittal, including amendments to the bid submittal, shall be in paper
medium. Electronic medium for the bid submittal documents will not be
allowed. Critical path method (Network Analysis System) is not
required. This solicitation includes bid options, which may not be
awarded. For this job, a small business is defined as having average
annual receipts of less than $17,000,000 for the past three years.
Specific questions related to this project may be answered by Ms. Karen
Williams at (334) 690-2713, fax (334) 690-2902. Refer questions on
distribution of plans/specifications to Plans Room (Karen Johnson) at
phone (334) 690-2535/2536, fax (334) 694-4343. Effective 1 July 1998,
firms interested in construction contracts with the Mobile District,
Corps of Engineers, must have "Internet Access". Don't be left out, get
it soon. For detailed information on this and other Mobile District
Projects, (Bidding instructions, technical inquiries, points of
contact, synopsis of work, plan holders, bid results, etc.,) please
visit our Internet home page at http://www.sam.usace.army.mil/sam/ct.
Posted 08/20/99 (W-SN370539). (0232) Loren Data Corp. http://www.ld.com (SYN# 0121 19990824\Y-0011.SOL)
Y - Construction of Structures and Facilities Index Page
|
|