COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 22,1999 PSA#2480Southeast Regional Office, BOP, Bldg. 2000, 3800 Camp Creek Parkway,
SW, Atlanta, GA 30331-5099 Y -- CONSTRUCTION SOL RFP 452-0013 DUE 020100 POC Vincent Falzone,
Contract Specialist, (678) 686-1411 E-MAIL: vfalzone@bop.gov,
vfalzove@bop.gov. The Department of Justice, Federal Bureau of Prisons,
Southeast Regional Office, Atlanta, Georgia, is seeking request for
construction for the Federal Correctional Complex in Coleman, Florida.
The Contractor shall provide all labor, material and equipment to
construct the following: 32,293 sf pre-engineered metal building
addition to the existing complax warehouse (warehouse expansion 16,442
sf, shop area 15,851 sf) 12,931 sf pre-engineered metal building
addition to the existing UNICOR warehouse, 3,600 sf Armory/
lockshop/Mailroom building and all related sites and utility system
work to support the above referenced structures. Also, as a add
alternate, the Contractor shall provide a separate price for a 7,978 sf
pre-engineered metal roof structure adjacent to the warehouse addition.
The Contractor shall be responsible for maintaining security measures
and standards by the Bureau of prisons for prison environment. The
magnitude for this project is between $1,000,000 and $5,000,000. The
plans and specifications will be available on or around december 27,
1999. The proposal due date is January 27, 2000 The contract
performance period is estimated to be approximately 365 calendar days
from the Notice to Proceed. This procurement is set-aside for 8(a)
firms and is restricted to North Florida firms. cc: OSDBU Posted
11/18/99 (W-SN401771). (0322) Loren Data Corp. http://www.ld.com (SYN# 0100 19991122\Y-0001.SOL)
Y - Construction of Structures and Facilities Index Page
|
|