Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 22,1999 PSA#2480

USDI, Bureau of Reclamation, 125 South State Street, Room 6107, Salt Lake City, Utah 84138-1102.

Y -- SYAR TUNNEL CONTROL GATE AND BYPASS PIPING, DIAMOND FORK POWER SYSTEM, BONNEVILLE UNIT, CENTRAL UTAH PROJECT, UTAH SOL 00-SP-40-3130 DUE 011800 POC Lee Ann Knapp, C.S.,(801)524-3665 or C.O., Rick Kerr(801)524-3681;Technical:Cary Southworth (801)379-1290, Brent Rheese (801)379-1210 WEB: Acquisition Office, Upper Colorado Region, Bureau of, http://www.uc.usbr.gov/acq/index.html. E-MAIL: Lee Ann Knapp, leknapp@uc.usbr.gov. The principal components of the work to be performed under these specifications include the following: Earthwork for exposing approximately 70-feet of the existing Syar Tunnel Pipeline and tunnel portal area. Demolition for and removal of approximately 38-feet of the existing 102-inch-diameter Syar Tunnel Pipeline. Furnishing and Installing one 7.25 X 9.25-feet slide gate and transitions. Furnishing and installing of approximately 10-feet of 102-inch-diameter, steel line pipe between the existing 102-inch-diameter steel line pipe and the slide gate transitions. Furnishing and placing backfill and compacting backfill about the pipe and tunnel portal area. Construction of the slide gate reinforced concrete encasement and concrete control house. Constructing access road and service yard with gravel surfacing. Furnishing and installing one hydraulic control system for the 7.25 X 9.25-feet slide gate. Furnish and installing piping, valves and air valves. Furnishing and installing heating and ventilation system. Furnishing and installing equipment and materials for complete electrical system. Design, furnish and installing bulkheads for diversion of Syar Tunnel and isolation of Sixth Water Aqueduct. Design, furnish and installing bulkheads for diversion of Syar Tunnel and isolation of Sixth Water Aqueduct. Install 20-inch stainless steel piping system in crown of strawberry Inlet Tunnel and to gate shaft and existing connecting tunnel. Make connection of new by-pass piping to existing 24-inch by-pass piping line and terminate new by-pass piping in existing connecting tunnel to Strawberry. The work is accessed through Syar Tunnel and the control gate work area. The Syar Tunnel is 6.2 miles in length. Make needed repair to Strawberry Tunnel and access road to facilitate movement of equipment and materials to install the piping. Final cleanup of pipeline and tunnels. Estimated price range of job falls in the step between $1,000,000 to $5,000,000. Bid performance, and payment bonds will be required. Work is under SIC Code 1629. Contract performance is to be complete in two schedules: Schedule 1 -- 4/1/01, Schedule 2 -- 5/30/01. All responsible sources may submit proposals which will be considered for award. This solicitation will be available in hard paper copy only approximately December 15, 1999. Cost for the solicitation set is $50.00. Only checks (made out to Bureau of Reclamation) and requests in writing will be accepted. Send requests to: Bureau of Reclamation, Attention: UC-821, 125 South State Street, Room 6107, Salt Lake City, Utah, 84138-1102. Posted 11/18/99 (W-SN402126). (0322)

Loren Data Corp. http://www.ld.com (SYN# 0104 19991122\Y-0005.SOL)


Y - Construction of Structures and Facilities Index Page