COMMERCE BUSINESS DAILY ISSUE OF NOVEMBER 22,1999 PSA#2480USDI, Bureau of Reclamation, 125 South State Street, Room 6107, Salt
Lake City, Utah 84138-1102. Y -- SYAR TUNNEL CONTROL GATE AND BYPASS PIPING, DIAMOND FORK POWER
SYSTEM, BONNEVILLE UNIT, CENTRAL UTAH PROJECT, UTAH SOL 00-SP-40-3130
DUE 011800 POC Lee Ann Knapp, C.S.,(801)524-3665 or C.O., Rick
Kerr(801)524-3681;Technical:Cary Southworth (801)379-1290, Brent Rheese
(801)379-1210 WEB: Acquisition Office, Upper Colorado Region, Bureau
of, http://www.uc.usbr.gov/acq/index.html. E-MAIL: Lee Ann Knapp,
leknapp@uc.usbr.gov. The principal components of the work to be
performed under these specifications include the following: Earthwork
for exposing approximately 70-feet of the existing Syar Tunnel Pipeline
and tunnel portal area. Demolition for and removal of approximately
38-feet of the existing 102-inch-diameter Syar Tunnel Pipeline.
Furnishing and Installing one 7.25 X 9.25-feet slide gate and
transitions. Furnishing and installing of approximately 10-feet of
102-inch-diameter, steel line pipe between the existing
102-inch-diameter steel line pipe and the slide gate transitions.
Furnishing and placing backfill and compacting backfill about the pipe
and tunnel portal area. Construction of the slide gate reinforced
concrete encasement and concrete control house. Constructing access
road and service yard with gravel surfacing. Furnishing and installing
one hydraulic control system for the 7.25 X 9.25-feet slide gate.
Furnish and installing piping, valves and air valves. Furnishing and
installing heating and ventilation system. Furnishing and installing
equipment and materials for complete electrical system. Design, furnish
and installing bulkheads for diversion of Syar Tunnel and isolation of
Sixth Water Aqueduct. Design, furnish and installing bulkheads for
diversion of Syar Tunnel and isolation of Sixth Water Aqueduct. Install
20-inch stainless steel piping system in crown of strawberry Inlet
Tunnel and to gate shaft and existing connecting tunnel. Make
connection of new by-pass piping to existing 24-inch by-pass piping
line and terminate new by-pass piping in existing connecting tunnel to
Strawberry. The work is accessed through Syar Tunnel and the control
gate work area. The Syar Tunnel is 6.2 miles in length. Make needed
repair to Strawberry Tunnel and access road to facilitate movement of
equipment and materials to install the piping. Final cleanup of
pipeline and tunnels. Estimated price range of job falls in the step
between $1,000,000 to $5,000,000. Bid performance, and payment bonds
will be required. Work is under SIC Code 1629. Contract performance is
to be complete in two schedules: Schedule 1 -- 4/1/01, Schedule 2 --
5/30/01. All responsible sources may submit proposals which will be
considered for award. This solicitation will be available in hard paper
copy only approximately December 15, 1999. Cost for the solicitation
set is $50.00. Only checks (made out to Bureau of Reclamation) and
requests in writing will be accepted. Send requests to: Bureau of
Reclamation, Attention: UC-821, 125 South State Street, Room 6107, Salt
Lake City, Utah, 84138-1102. Posted 11/18/99 (W-SN402126). (0322) Loren Data Corp. http://www.ld.com (SYN# 0104 19991122\Y-0005.SOL)