|
COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 17,1999 PSA#2498U.S. Army CECOM, CECOM Acquisition Center, Fort Monmouth, NJ
07703-5008 N -- INSTALL CARD ACCESS SYSTEM, BUILDING 2705 SOL DAAB08-00-B-0001
DUE 013100 POC JOHN O'LEARY,Contract Specialist 732-427-1369, VIRGINIA
O'NEILL,Contracting Officer 732-427-1437 Provide all plant labor,
materials and equipment and perform all work required to "INSTALL CARD
ACCESS SYSTEM, BUILDING 2705 FORT MONMOUTH, NEW JERSEY" In strict
accordance with Drawing No. 10953-1 and Specification PR 99-0844. The
scope of work shall consists of installing card access equipment in
building 2705 to include but not be limited to: Installation of
Electromagnetic Locks, Emergency Release stations, Card Readers,
Balanced Magnetic switches, Key Switch Override and Request to Exit
Button. Contractor must be a Westinghouse Certified Dealer. Estimated
cost range is between $25,000.00 and $100,000.00. Site visit will be
specified in IFB DAAB08-00-B-0001. Construction completion time is 60
days. There will be a charge of $9.00 per set of drawing and
specifications. All checks are to be drawn to " Finance and Accounting
Officer," add Accounting Classification Code "21R3210". Respond in
writing to Mr. John O'Leary, Attn: AMSEL-AC-CC-RT-S(O'LE) See Note #1.
Posted 12/15/99 (W-SN408918). (0349) Loren Data Corp. http://www.ld.com (SYN# 0060 19991217\N-0001.SOL)
N - Installation of Equipment Index Page
|
|