|
COMMERCE BUSINESS DAILY ISSUE OF JANUARY 25,2000 PSA#2522USACE Vicksburg District, 4155 Clay Street, Vicksburg, MS 39180-3435 Y -- FLOOD CONTROL, MISSISSIPPI RIVER AND TRIBUTARIES, BLACK CREEK
WATERSHED SOL DACW38-00-B-0015 DUE 032100 POC GLEN.E.SMITH, Contract
Specialist, 601-631-5350 WEB: Vicksburg Consolidated Contracting Office
Home Page, http://www/mvk/usace.army.mil/contract. E-MAIL: Glen E.
Smith, Glen.E.Smith@MVK02.usace.army.mil. Description of Work: The work
consists of furnishing all plant, labor, materials, and equipment, and
constructing a floodwater retarding structure in Holmes County,
Mississippi. Principal features of the work include clearing and
grubbing, excavation, backfill, embankment, engineering fabric, stone
protection, concrete pressure pipe, concrete work, dewatering, water
control, fertilizing, seeding, mulching, lime treatment, miscellaneous
metals, slide gate and manually operated gate hoist, storm water
pollution prevention and environmental protection. The estimated value
of the work is between $1,000,000 and $5,000,000. Plans and
specifications will be available on the Vicksburg Consolidated
Contracting Office (VCCO) homepage at
http://www.mvk.usace.army.mil/contract/ http:and on compact disc at no
charge. Hardcopies will not be available. The compact disc may be
requested electronically by registering on our homepage or mailing your
request to VCCO at 4155 Clay Street, Vicksburg, Mississippi
39183-3435.Fax No. 601-631-7263. Issue date on or about 18 February 00.
Bid opening date on or about 21 March 00. THE PROPOSED CONTRACT IS 100%
SET-ASIDE FOR SMALL BUSINESS CONCERNS. SEE Note 1. Posted 01/21/00
(W-SN417502). (0021) Loren Data Corp. http://www.ld.com (SYN# 0057 20000125\Y-0001.SOL)
Y - Construction of Structures and Facilities Index Page
|
|