|
COMMERCE BUSINESS DAILY ISSUE OF JULY 7,2000 PSA#2637P -- LOADING AND REMOVAL OF PAVEMENT DEBRIS This is a combined
synopsis/solicitation for commercial items prepared in accordance with
the format in Subpart 12.6, as supplemented with additional
information included in this notice. This announcement constitutes the
only solicitation; proposals are being requested and a formalized
written solicitation will not be issued. This solicitation,
F05604-00-R-8004, is being issued as a Request for Proposal (RFP). The
solicitation document and incorporated provisions and clauses are
those in effect through Federal Acquisition circular 97-13. The
Standard Industrial Classification (SIC) code is 4953 and the Business
Size Standard is $6.0M. The proposed contract will be solicited as
"100 percent small business set-aside". STATEMENT OF WORK FOR LOAD AND
REMOVAL OF PAVEMENT DEBRIS 1. GENERAL INFORMATION. The Contractor
shall provide all management, tools, supplies, equipment and labor
necessary to ensure that debris removal services are performed at
Peterson AFB Colorado in a manner that will comply with government and
commercial standards for debris removal. Estimated quantities are:
1.1. ROUTINE SERVICE CALLS. The government estimates approximately
4,000 tons of debris on an on-call basis per contract year. 1.2.
SPECIAL EVENTS SERVICE CALLS. The government estimates two (2) special
events service calls per contract year. Each load is estimated to
contain anywhere from 20 to 2,400 tons of debris. 2. SUPERINTENDENCE BY
CONTRACTOR. The contractor shall at all times provide adequate
supervision of his employees to ensure complete and satisfactory
performance of all work in accordance with the terms of the contract.
3. SPECIFICATIONS AND DESCRIPTION OF WORK. 3.1. ENVIRONMENTAL AND
HAZARDOUS MATERIALS HANDLING. If the Contractor suspects there may be
any hazardous materials mixed in with the debris, he shall notify the
QA PERSONNEL immediately and await further instructions. 3.2. RECORDS.
The contractor shall maintain sufficiently detailed records to
indicate the dates of waste pick-ups, the method of transportation, the
segregation or commingling of different types of wastes, and the
location of the disposal site. If waste has been diverted to a
recycling or a reuse effort the contractor shall provide the
Environmental office with an accurate weight report. The contractor
shall provide this information to the Base Civil Engineering
Environmental Management and Planning Flight within five (5) working
days of receipt of the request. 3.2.1. The Contractor shall send a copy
of the receipt from the landfill or recycling center stating the number
of cubic yards (or provide weight tickets) of debris disposed from
Peterson AFB with his invoice. Air Force Diversion Rate and Reporting
Requirements. The contractor shall provide the following demolition
project information: 3.2.1.1. Amount (tons) of demolition debris solid
waste recycled reused or diverted from landfill. 3.2.1.2. Amount (ton)
of construction/demolition non-hazardous solid waste sent to landfill
facilities. 3.3. LICENSES AND PERMITS. The contractor shall be
responsible for obtaining any necessary licenses and permits, and for
complying with any federal, state, and municipal laws, codes, and
regulations applicable to the performance of work. Contractor shall
provide proof of such applicable licenses and permits upon request of
the Air Force. 3.4. ROUTINE SERVICE CALLS. The Contractor shall load
and remove from Peterson AFB all pavement debris to include concrete,
asphalt, rocks, dirt, debris, wood and metal WITHIN FIVE (5) WORKDAYS
after notification by the Quality Assurance (QA) personnel. All debris
removed shall be properly disposed of off Peterson AFB by the
Contractor at a suitable, approved landfill or recycling center in
compliance with all applicable federal, state, and local regulations.
3.5. SPECIAL EVENTS SERVICE CALLS. On occasion, there may be a
requirement to remove pavement debris due to a VIP visit, IG
inspection, etc. The QA personnel will notify the contractor as soon as
a special event requirement is known, but not less than 48 hours prior
to the event to provide as much notification as possible. The
contractor shall load and remove from Peterson AFB all pavement debris
to include concrete, asphalt, rocks, dirt, debris, wood and metal
WITHIN TWO (2) WORKDAYS after notification by the QA personnel. All
debris removed shall be properly disposed of off Peterson AFB by the
contractor at a suitable, approved landfill or recycling center in
compliance with all applicable federal state and local regulations. 4.
QUALITY CONTROL. The contractor shall develop and maintain a quality
program to ensure services are performed in accordance with commonly
accepted commercial practices. Contractor shall develop and implement
procedures to identify and prevent defective services from recurring.
5. QUALITY ASSURANCE. The government will periodically evaluate the
contractor_s performance by appointing a representative(s) to monitor
performance to ensure services are received. The government
representative will evaluate the contractor_s performance through
intermittent on-site inspections of the contractor_s quality control
program and receipt of complaints from base personnel. The government
may inspect each task as completed or increase the number of quality
control inspections if deemed appropriate because of repeated failures
discovered during quality control inspections or because of repeated
customer complaints. Likewise, the government may decrease the number
of quality control inspections if performance dictates. The government
will also receive and investigate complaints from various customers
located on the installation. The contractor shall be responsible for
initially validating customer complaints. However, the government
representative shall make final determination of the validity of
customer complaints(s) in cases of disagreement with customer(s). 6.
HOURS OF OPERATION. 6.1. NORMAL HOURS OF OPERATION. The contractor
shall provide services required under this contract during the
following hours: 7:30 a.m. and 4:00 p.m. Monday through Friday. 6.2.
HOLIDAYS. Work shallnot be required on the following holidays or any
holidays observed in lieu thereof: New Year's Day (January) Labor Day
(September) Martin Luther King Day (January) Columbus Day (October)
President's Day (February) Veterans' Day (November) Memorial Day (May)
Thanksgiving Day (November) Independence Day (July) Christmas Day
(December) 7. SECURITY REQUIREMENTS. The Contractor shall be
responsible for obtaining all necessary cards, passes, decals or other
items required for access to Peterson AFB. The Contractor shall be
required to apply for vehicle and individual identification at the
Peterson AFB Security Police Squadron Visitor's Control Center, Bldg
1820. All personnel operating a vehicle on Peterson AFB shall be a
licensed driver and all vehicles shall be licensed and insured. Upon
completion or termination of the contract, the Contractor shall
surrender any vehicle identification to the Security Police at the
Visitor's Control Center, Bldg 1820. WEB: Visit this URL for the latest
information about this,
http://www.eps.gov/cgi-bin/WebObjects/EPS?ACode=S&ProjID=F05604-00-R-8
004&LocID=533. E-MAIL: Mary Young, Mary.Young@peterson.af.mil. Posted
07/05/00 (D-SN471587). Loren Data Corp. http://www.ld.com (SYN# 0549 20000707\SP-0006.MSC)
SP - Special Notices Index Page
|
|