Loren Data Corp.

'

  
COMMERCE BUSINESS DAILY ISSUE OF JULY 12,2000 PSA#2640

Directorate of Contracting, Attn: ATZS-DKO, P.O. Box 12748, Fort Huachuca, Arizona 85670-2748

Z -- RESURFACING OF HANGAR FLOOR (CBD #471671) DUE 071300 POC Eileen Bradley, (520) 533-1400 E-MAIL: Click here to contact the contracting specialist via, bradleye1@huachuca-emh1.army.mil. CBD Submission # 471671 is amended by changing items (v) Description and (xvii) Quote due date, and adding item (xviii) Certification. Item (v) Description: Contractor shall provide all material, labor, and supplies to resurface the floor at Hangar 3, located at Fort Huachuca, AZ 85613. Specifications: (1) Shot blast the entire area, approximately 19,502 square feet, that will receive new coating to remove existing coating. (2) Scrape floor and re-shot blast floor to profile concrete. (3) Patch cracks 1/16" wide or wider and holes " in diameter or larger. (4) Apply a flat squeegee coat of Tennant Eco-MPE 100% solids epoxy or equivalent. If equivalent, it is the contractor's responsibility to provide a list of salient features as those in name brand product. List of name brand salient features will be faxed upon request. Color to be light gray (2 MILS). (5) Apply a flat squeegee coat of Tennant Eco-MPE 100% solids epoxy or equivalent. Color to be light gray (13 MILS). (6) Screen floor. (7) Scrub floor (8) Apply a topcoat of Tennant Eco-HPS (High Performance System) or equivalent. If equivalent, it is the contractor's responsibility to provide a list of salient features as those in name brand product. List of name brand salient features will be faxed upon request. Color to be light Gray (3.2 MILS). (9) Install a 3" fire lane striping. (10) Install basketball and volleyball court lines. (11) Install two (2) 5x5 squadron logos under clear-coat during second phase. Please provide your Duns and Bradstreet number, Federal Tax ID number, and quote FOB destination prices. (vi) Delivery date: work is to be completed on or before 20 Jul 00. Work stoppage in Hanger cannot exceed five (5) working days. Item (xvii) Quote date: Quotes are extended until 1600 (PST), 13 Jul 00. Item (xviii) Certification: All offerors shall provide proof from the manufacturer that their application techniques will be in compliance with the manufacture's recommended application procedures so not to void manufacture's warranty. Posted 07/10/00 (W-SN472863). (0192)

Loren Data Corp. http://www.ld.com (SYN# 0156 20000712\Z-0018.SOL)

Z - Maintenance, Repair or Alteration of Real Property Index  |  Issue Index |


Created on July 10, 2000 by Loren Data Corp. -- info@ld.com