COMMERCE BUSINESS DAILY ISSUE OF MARCH 29, 2001 PSA #2818
SOLICITATIONS
Z -- PROJECT LXEZ 01-2902, DEMOLISH BLDG 725, KADENA AB, OKINAWA,
- Notice Date
- March 27, 2001
- Contracting Office
- Department of the Air Force, Pacific Air Forces, 18 CONS, Unit 5199, Kadena AB, APO Japan, ., 96368-5199
- ZIP Code
- 96368-5199
- Solicitation Number
- F62321-01-R0072
- Response Due
- May 18, 2001
- Point of Contact
- Devin Banks, Contract Specialist, Phone 634-5839, Fax 634-7626, Email devin.banks@kadena.af.mil -- Andre Prude, Deputy Flight Commander, Construction, Phone 634-7619, Fax 634-4795/96, Email
- E-Mail Address
- Devin Banks (devin.banks@kadena.af.mil)
- Description
- Project LXEZ 01-2902, Demolish Building 725: Work includes but is not limited to demolition, removal, disposal of entire facility and surrounding smaller facilities (i.e., storage sheds, pump stations, ect...) including asbestos containing materials, utilities, excavation, backfill, compaction, hydroseeding, restoration of site and other incidental related work necessary to complete this project in accordance with specifications and drawings. ADDITIONAL DESCRIPTION: 1. Removal and disposal of building 725, including the smaller structures around it (i.e., power and pump stations, decorative block wall, and concrete walkways -- to include stairs/pads/manhole), is a 2-storey concrete structure with approximately 50,110 square feet of ground floor area. Removal work shall encompass the entire structure -- to include its foundation, utilities, and asbestos containing materials (ACM). Additionally, work shall include (with the exception of areas indicated within the work limits that are to be illustrated in future drawings and specifications) the removal of all asphaltic concrete (AC) pavements. 2. Line items will be incorporated in the final version of the contract to facilitate re-grade, fill materials and hydro-seeding (if required); to establish a well-graded ground surface with sufficient slope to avoid drainage problems. As it stands, the graded area shall follow the general contour of the adjacent areas, and the area affected by the demolition work will need to be hydro-seeded. 3. The dimensions and locations of structures to be removed will be verified in the field. Also, the contractor shall verify the project site and satisfy himself as to the existing conditions where the work is to be accomplished.
- Web Link
- Visit this URL for the latest information about this (http://www.eps.gov/cgi-bin/WebObjects/EPS.woa/wa/SPF?A=M&P=F62321-01-R0072&L=642)
- Record
- Loren Data Corp. 20010329/ZSOL015.HTM (D-086 SN50H4X0)
| Z - Maintenance, Repair or Alteration of Real Property Index
|
Issue Index |
Created on March 27, 2001 by Loren Data Corp. --
info@ld.com
|
|
|
|