COMMERCE BUSINESS DAILY ISSUE OF JULY 12, 2001 PSA #2891
SOLICITATIONS
47 -- PRE-ENGINEERED/PREFABRICATED/PREINSULATED UNDERGROUND PIPING SYSTEM
- Notice Date
- July 10, 2001
- Contracting Office
- Director Supply Dept., Naval Training Center, Bldg 3200 Code N23, 2701 Sheridan Road, Great Lakes, IL 60088-5001
- ZIP Code
- 60088-5001
- Solicitation Number
- N00210-01-Q-0316
- Response Due
- July 16, 2001
- Point of Contact
- Ms. Robin Castellucci 847-688-6975 x27
- E-Mail Address
- Click here to contact the Contracting Officer (castelluccirl@pwcgl.navfac.navy.mil)
- Description
- System Descriptions: Steam manhole 271 to Building 1124 and steam manhole 271 to Building 1125: Provide underground pre-engineered 4" steam piping and 3" condensate piping in seperate conduits. Steam System: 278 gross feet of standard pre-fabricated/preinsulated underground pipe system consisting of a 12.75" diameter steel casing containing one (1) 4" Schedule 40 ERW carbon steel pipe preinsulated with mineral wool insulation. The following fittings shall be prefabricated/preinsulated in a like manner and in all cases factory assembled to straight lengths of pipe: 4 each 90 degree elbows, 4 each end seals, 4 each anchors, guides for placing pipe inside a 16" casing. Condensate System: 278 gross feet of standard pre-fabricated/preinsulated underground pipe system consisting of a 8.625" diameter steel casing containing 1 3" Schedule 30 ERW carbon steel pipe preinsulated with mineral wool insulation. The following fittings shall be pre-fabricated/preinsulated in a like manner and in all cases factory assembled to straight lengths of pipe: 4 each 90 degree elbows, 4 each ends seals, 4 each anchors, guides for placing pipe inside a 12" casing. ** Upon award of contract the vendor shall visit the job site and verify all measurements. **
- Record
- Loren Data Corp. 20010712/47SOL002.HTM (W-191 SN50R2Z1)
| 47 - Pipe, Tubing, Hose and Fittings Index
|
Issue Index |
Created on July 10, 2001 by Loren Data Corp. --