COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 13,1999 PSA#2430South Dakota Department of Transportation, 700 East Broadway Avenue,
Pierre, South Dakota 57501-2586 Y -- NOTICE FOR REQUIREMENT FOR PREQUALIFICATION OF DRILLED SHAFT
SUBCONTRACTORS FOR BRIDGE PROJECT SOL P 0019(20)0 DUE 110199 POC John
Cole, Chief Bridge Design Engineer, SDDOT, 605-773-3285 or Vern Bump,
Geotechnical Engineer, SDDOT, 605-773-3401 E-MAIL: click here to
contact the Chief Bridge Design Engineer, john.cole@state.sd.us. P
0019(20)0, PCEMS 238H, Clay County -- Vermillion and Newcastle, NE
Bridge over Missouri River, including grading and interim surfacing,
will be ready for the January 19, 2000 Bid Letting. A new 748.380m
(2,455 ft) long continuous composite girder bridge will be built across
the Missouri River near Vermillion, SD. The primary foundation type for
this structure will be drilled shafts. Pre-approval of drilled shaft
subcontractors will be required prior to the bid letting. A drilled
shaft subcontractor meeting will be held at the North Sioux City
Community Center, 205 Sodrac Drive, North Sioux City, SD at 10 AM on
October 19, 1999. The purpose of the meeting will be to: 1. Provide
drilled shaft subcontractors with an opportunity to view outcrops which
are representative of the subsurface material at the project site and
review boring logs, cores and other records from the subsurface
investigation. 2. Provide information regarding drilled shaft
subcontractor pre-approval requirements and answer questions.
Attendance at the above meeting is a mandatory part of the pre-approval
requirements. Drilled shaft subcontractors who do not attend the above
meeting will be considered ineligible for pre-approval on this
project. Substructure units will consist of seven 3050 mm (10 ft)
diameter drilled shafts and eight (6 ft) diameter drilled shafts. Depth
of drilled shaft excavation will be approximately 26 m (85 ft) and
total volume of drilled shaft excavation is estimated to be
approximately 1,580 cu m(2,067 cu.yd) Approximately five of the drilled
shafts will be within the ordinary high water channel on the Missouri
River. After initial discussion in North Sioux City, the meeting wil
break for lunch and then reconvene on the Nebraska side of the Missouri
River to view and discuss outcrops and to view the project site.
Drilled shaft subcontractors will need to provide their own ground
transportation. Drillled shaft subcontractor pre-approval requirement
will be available on October 4, 1999 and can be obtained from the SDDOT
Project Development Office, 605-773-3268. Deadline for submittal of
completed pre-approval documents is November 1, 1999. Drilled shaft
subcontractors who are determined to meet the pre-approval requirements
will appear on a list of approved drilled shaft subcontractors which
will appear in the bid proposal forms. A pre-bid conference will be
announced at a later date. For further updates you may visit the
Contractor's Page (www.state.sd.us/dot/bidlet/) Posted 09/09/99